Electric winch 230 V / 50 Hz with 43 m rope (6 mm diameter)
21 m limit switch cable
,Controller (24 V) with emergency stop and 5 m line
Controls and limit switch at Geda LIFT 200 Standard
firmly connected
standard trolley with rope breakage protection
head with quick-guide pulleyFoot section 2 m
Load 200 kg
Lifting speed 25 m / min (= 1-stage), 1 kW / 230 V / 50 Hz.
The construction of Geda hoists Construction hoist is so simple that even untrained workers undertake construction work within minutes. Using massive screws to the conductor parts at the bottom bolted together without tools. First, the rails are pushed to the funicular to the manager profile. Once the conductor system or the scaffolding of the facade has been attached, the elevator is easily guided to the profile. A stance-support beneath the circuit ensures the weight of the elevator and of the transport material. With the help of versatile load-carrying means the material can be transported now.
Accessories
for Geda funicular Dachdeckeraufzug
Flexible working variable devices are necessary. Therefore, the Geda inclined lifts lifts more devices for transporting different chocks available:
brick platform with a folding grille
brick truck with pallet
Universal platform with Eimergehänge
Universal platform with side protectionTilting with dump body up to 130 ° tiltable
extra-wide bed for long components
special equipment for lying and standing material handling